When the building uses power
Operating hours and daytime consumption decide how much solar can be used directly.
Commercial rooftop solar

Designed for the way your site works
We look at operating hours, backup power, fire access, roof services and future maintenance before fixing the layout.
Before a useful quotation
Operating hours and daytime consumption decide how much solar can be used directly.
Fire routes, tanks, services, drainage and future maintenance remain part of the layout.
Backup power, LT distribution and the operating schedule shape the connection plan.
Our scope
Scroll through the work that sits behind the finished rooftop array.

Your AC and lighting run all day — which is exactly when the roof is producing.
The layout also protects fire routes, water tanks and the access you need later.

A long-span shed roof can carry real capacity once the structure and drainage are checked.
We plan the array around vents, skylights and the routes your team walks.

Critical loads have to be coordinated with your DG and existing distribution.
Work is sequenced so a building that never closes never has to.

Campus systems need generation, distribution and long-term access planned together.
We work around exam weeks and occupied blocks — we have done it at VNSGU and SVNIT.

Routine inspection keeps the plant dependable long after handover.
We compare generation against site conditions and fix the cause, not the symptom.
The case for solar
Your building already uses most of its electricity during the day. Solar produces at exactly those hours, so the power goes straight into the building instead of being bought from the grid.
Indicative figures
Three examples so you can see the shape of it. These are worked estimates, not past projects. We have used 4.4 units per kW per day, which is the careful end of what Gujarat rooftops actually give, and valued each unit at ₹9 — a little under what you pay, because your fixed and demand charges carry on regardless.
Based on ₹45,000 per kW installed and ₹9 a unit.
Based on ₹42,000 per kW installed and ₹9 a unit.
Based on ₹40,000 per kW installed and ₹9 a unit.
Your own figure depends on your roof, your tariff and how much of your load runs during the day. We will not put a payback number in writing before we have seen your site — a free visit settles it properly.
Figures are indicative and subject to applicable government regulations, tariff structure, project conditions and tax treatment.
Tax treatment
Solar is a business asset, so the tax treatment differs from an ordinary electricity bill. What actually applies depends on your company, your books and the regulations in force when the plant is commissioned.
Section 32 of the Income Tax Act lets a business write off 40% of the system cost in its first year, and the rate is unchanged for 2025-26. If the plant is commissioned in the same year, a further 20% may also apply.
GST paid on a system used for your business may be available as input credit, depending on your registration and how the asset is used. Your CA will confirm what applies.
When the panels make more than the building is using, the surplus goes to the grid and is credited against later bills under your DISCOM net-metering arrangement.
Your meter records exactly how much clean power you generated, so CSR and sustainability reporting uses a real figure instead of an estimate.
How much of this applies depends on your company and how the asset is entered in your books, so please run it past your CA before it goes into a proposal. These are not guaranteed benefits.
Figures are indicative and subject to applicable government regulations, tariff structure, project conditions and tax treatment.
Our process
We review the bill, daytime load, roof and electrical connection.
You receive a site-specific layout, equipment plan and approval route.
Work is scheduled around access, safety and operating hours.
We test the system and organise the final project records.
Commercial enquiry
Send a recent bill and the building location. We come back with the likely capacity, what the roof and connection need to confirm, and the questions worth settling before a survey.
Initial size and fit review
02Call with site-specific questions
03Survey when the project is ready