Sunlight
Before any panel is placed, we record the clear terrace area, the shade cast by tanks and stairwells, and the route by which material will reach the roof.
The array
The layout is developed around the available area and the existing structure, rather than adapted from a standard drawing.
Generation
String by string, the current is carried across the roof towards the inverter.
The strings
Modules are wired into strings and carried in tray, so that no part of the system requires access across the waterproofing in later years.
Conversion
Direct current from the roof is converted to the alternating current that serves machinery, lifts, lighting and air conditioning.
Protection
ACDB, DCDB, earthing and surge protection, sized to the site and labelled so that the installation can be read by any competent electrician.
Connection
We install the net meter and conduct the DGVCL process. The grid supplies the balance that the roof does not cover.
Testing and handover
Protection, earthing and every termination are tested. Drawings, test reports and approvals are issued as a single handover file.
The result
Send one recent bill and the site location. We will provide an indicative system size before any visit is arranged.
Ten fixed scenes: sunlight reaches the roof, the array captures it, direct current runs to the inverter, protection is fitted, usable power enters the building and the grid bill falls.
Our record
Drawn from our current company profile. Each figure is a count of contracts delivered, not a projection.
Partnership firm from May 2023
Awarded and under execution
Government, institutional and private
R&B, SMC, GSECL, AAI, universities
Government and private sector
SMC and Awas Yojana housing
Detailed project records, client names and contract values are in our company profile. See the project list
Our manufacturer partners
Destiny Electrical holds an authorised channel partner appointment with Rayzon Solar for the Surat region, Gujarat, supported by established supply relationships across modules, inverters, switchgear and balance of system.
Equipment is selected on the merits of each project. The make, model, warranty and supply terms are specified in the quotation and confirmed in writing before any order is placed.


Our services
An R&B registered Class “A” contractor and GEDA approved solar EPC agency, covering 17 services from rooftop solar to HT substations, panels, fire and ELV systems.
Call us, message us on WhatsApp, request a quotation, or arrange a free site assessment.
Quick estimate
Consumption-led sizing
Rooftop capacity

This is an indicative estimate only. Final system capacity and project cost will be confirmed after site survey and technical evaluation.
Our solutions

Shift load, roof access and the electrical tie-in are reviewed together.
View industrial solutions
Operating hours, fire access and uninterrupted building use shape the layout.
View commercial solutions
Roof space, the sanctioned load and the PM Surya Ghar route are checked together.
View residential solutionsOur work on site
A short walkthrough of a rooftop we finished — the panels, the structure holding them up, and the space we leave around them for cleaning and repairs. This is the standard of work we hand over.
Why clients appoint us
We are electrical contractors first, working in Surat since 2014. That means the panels, the wiring and the connection to your building are all handled by the same licensed team — and you always know who is responsible.
The same team coordinates the rooftop array, cable route, protection and electrical-room connection.
Access, production shifts, shutdown windows and roof services are discussed before the installation schedule is fixed.
The sizing basis, roof assumptions, equipment schedule and scope boundaries are discussed before the order.
Testing results, protection details, drawings and approval records are organised for the facility team at handover.
Commercial considerations
Three numbers decide whether it makes sense for you. None of them is the price of a panel.
Solar assets carry 40% accelerated depreciation in year one under Section 32 of the Income Tax Act, unchanged in the 2025–26 Finance Act. On a plant put to use in the same year, a further 20% additional depreciation may apply. Your CA confirms the position for your books.
An LT commercial or industrial unit in Gujarat lands near this once the energy charge, FPPPA at ₹2.30 per unit and duty are counted. Generation from your own roof displaces units at that rate first, during the hours your plant is running.
Gujarat allows net metering from 1 kW up to 1 MW; beyond that the arrangement changes. Sanctioned load, transformer capacity in your area and consumer category decide what your site can actually export.
Figures are the published position, not a quotation. The landed cost per unit for your site depends on roof, structure, connection and scope — which is what the survey settles. Figures are indicative and subject to applicable government regulations, tariff structure, project conditions and tax treatment.
Before appointment
These four arise on almost every project. Our position on each is set out below.
No. The roof and structure work happens around your shifts. Only the final connection needs a short power cut, and we agree that time with your electrician well before we start — you will never be told on the day.
We check that before we quote — the sheet condition, the structure underneath and how the panels will be fixed. If the roof needs repair first, we tell you and price it, instead of building on top of a problem.
We do. The DISCOM application, the drawings, net metering and the final inspection are all part of our job. You sign where your signature is needed and we take care of the rest.
Us. The same licensed contractor supplies the panels, builds the structure, does the wiring and completes the connection. You are not chasing three different vendors in year four.
Our process
Four stages, each with a defined output, so the position is known at every point of the contract.
We start with recent bills, operating hours and the daytime load the solar plant can actually serve.
The team checks usable roof, shade, structure, cable route, LT/HT connection and available protection.
You receive the proposed capacity, layout, equipment schedule, scope boundaries and approval route in one discussion.
Work is sequenced around the site, then tested and handed over with the project records.
Warranty & service
Two of these come from the manufacturer and two come from us. We put which is which in the proposal, so nothing depends on what was said on a call.
Tier-1 modules carry a linear performance warranty for 25 years, alongside a separate product warranty on the panel itself. The exact terms come with the equipment schedule.
ManufacturerThe inverter carries the manufacturer standard warranty, and most brands offer a paid extension. We tell you which applies before you order, not after.
ManufacturerScheduled maintenance visits at no charge — panel condition, mounting, cable route, protection and the connection checked over. Maintenance only: we do not run or operate the plant for you.
Destiny ElectricalOur own guarantee on the mounting structure, the wiring and the installation work. If something we built is at fault, we come back and put it right.
Destiny ElectricalWe provide free maintenance visits — not an operations contract. We do not run, monitor or operate the plant on your behalf, and we would rather say so here than let you assume it.
Our work
Layouts, mounting structure, finished arrays and the electrical work behind them — photographed on site rather than staged.

Road & Building Department, Gujarat

Road & Building Department, Gujarat

Off-grid converted to grid-connected

Airports Authority of India
Insights

Capacity limits, LT and HT connectivity, transformer headroom and the approval sequence for commercial and industrial rooftop solar net metering in Gujarat.
Read the guide
How 40% accelerated depreciation under Section 32 changes the first-year cost of a commercial or industrial solar plant, and what your accountant needs to confirm.
Read the guide
What rooftop solar looks like for factories across Surat, Sachin, Pandesara, Hazira, Ankleshwar and Vapi — roof types, connection routes and the constraints specific to these estates.
Read the guideQuestions
System size, installation planning, approvals and the information needed to begin.
We begin with recent bills and the daytime load profile, then check whether the usable roof and electrical connection can support that capacity. The calculator gives a first estimate; the survey confirms it.
A standard grid-tied system will not. When the supply fails the inverter disconnects automatically — that is a safety requirement, so the array cannot energise a line crew is working on. If you need specific loads to ride through an outage, that is a different architecture and we will discuss it against your load profile at the survey.
Most roof and mounting work can be planned without stopping production. Any final electrical shutdown is discussed with the facility team and scheduled around an agreed window.
The central financial assistance promoted under PM Surya Ghar is for eligible residential consumers and RWAs. A factory or commercial buyer should instead review the current DISCOM route, financing and tax treatment for that specific project.
A recent electricity bill and the project location are enough to start. Sanctioned-load details, roof drawings and transformer or DG information help if they are already available.
We include the applicable application, drawings, liaison and commissioning documents in the project route. The exact steps depend on the consumer category, capacity and current regulations.
Destiny Electrical is based in Surat and works across South Gujarat, including Surat, Sachin, Pandesara, Hazira, Ankleshwar, Bharuch and Vapi.
Free site visit
Share a recent electricity bill and your location. We will tell you what size system your roof can take, roughly what it costs, and what we need to check on site — at no charge.

Free site visit
Complete it with the information available to you today. We review it before calling, so the first conversation concerns your premises rather than a sales proposition.